From legacy SCADA to Ignition – with automatic conversion

Ignition SCADA screens on PC and mobile

In short: Replacing a SCADA system rarely means drawing everything from scratch. Elio has developed its own tools that extract the configuration from the old system and rebuild it in Ignition – tags, alarms, screens and history. That makes the transition faster, more affordable and less error-prone than doing it all by hand.

Why move to Ignition?

Many plants run SCADA platforms with expensive per-client licences, ended support and screens that only work in the control room. Ignition is web-based, has unlimited tags and clients per server, and is built on open standards such as OPC UA, MQTT and SQL. Screens open in the browser on PC, tablet and mobile.

What often keeps an old system alive is not the licence – it is the work of rebuilding everything. That is the work our tools take care of.

What the tools convert

  • Tags and signal list: addresses, data types, scaling and descriptions are extracted and created in Ignition – with a clean, consistent naming structure.
  • Alarms: limits, priorities and alarm texts come along, so the alarm setup does not have to be typed in again.
  • Screens: process graphics and symbols are recreated in Ignition, so operators feel at home from day one.
  • History and trends: logging and trend configuration is transferred, and existing historical data can be moved across.

From which systems?

The tools currently handle Citect, iFIX and Wonderware (AVEVA InTouch), among others. If you have another platform, we look at what can be extracted – much of the logic is the same.

How the transition works

  1. Survey: we review the current system, controllers and documentation, and find what can be reused.
  2. Automatic conversion: the tools build tags, alarms, screens and history in Ignition.
  3. Review and improvement: we quality-check the result and tidy up where the old system had weaknesses. The transition is a good opportunity to improve screens and alarms.
  4. Parallel operation and testing: the old and new systems can run side by side against the same PLCs, so everything can be tested before the old one is switched off.
  5. Handover and training: operators are trained, and we follow up during the first weeks.

What you gain

  • Shorter project: most of the manual work is done automatically.
  • Fewer errors: addresses and alarm limits are not copied by hand, so typos are avoided.
  • Lower cost: hours go into improvements instead of transcribing the old system.
  • No long stops: existing PLCs and sensors are reused, and production runs as normal.

Tools alone are not enough

Automatic conversion gives a strong starting point, but someone has to understand the process to know what is right. As a Gold Certified Ignition integrator with long experience in PLC and SCADA, we know both Ignition and the systems you are coming from – and what must be checked before the plant goes live.

Recognise the signs of a system past its prime? Read When your SCADA system gets too old.

Want to know what a move to Ignition would take for you? Read more about Ignition or contact us.

Back to Latest news

Sverre A. Blindheim

Get in touch

Want to know how we can help you? Call, e-mail me or write a message here, and we will talk about your needs.

Sverre A. Blindheim

Sr. Automation engineer / CEO

+47 97 05 80 66

sverre.blindheim@elio.no

Send a message

We only use the information to reply to you. Privacy